Board of Health approves septic system upgrades at two properties
Board of Health approves septic system modifications at two Wrentham residential properties. All three members unanimously approved modifications at 55 Walnut Road allowing septic system cover depths to 60 inches with H2O loading and venting, with Public Health Director Matthew Tanis confirming
Board of Health · Meeting of June 15, 2026
WRENTHAM — Board of Health approves septic system modifications at two Wrentham residential properties. All three members unanimously approved modifications at 55 Walnut Road allowing septic system cover depths to 60 inches with H2O loading and venting, with Public Health Director Matthew Tanis confirming optimal site placement. The Board also unanimously approved four locational waivers at 143 Lakeside Avenue for a shared septic system replacing a failed cesspool serving two dwellings, protecting environmental and public health.
The Board scheduled a public hearing on proposed Kratum regulations for August 3, 2026.
In the full story:
- The complete report — 300 words
Source: the Board of Health meeting of June 15, 2026, compiled from the official minutes.
Members read the rest of this story and every Wrentham meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this brief
Know someone in Wrentham who follows town government? Share Townbrief Wrentham: they can sign up free.